PROJECT INFO
The hotel (former Coral) was a three star hotel and was fully renovated to a five star one. The hotel consists of two buildings. Building A is situated on the front street façade and consists of ground floor and three floors. Building B is situated at the back of the plot and consists of seven floors. The hotel has 141 rooms (major amount of them have plunge pools), two public pools and 3 restaurants.
PROJECT FIGURES
SITE SURFACE | 2.155 m² |
ABOVE GROUND SURFACE | 8.081 m² |
DESIGN DURATION | 2020 |
CONSTRUCTION DURATION | 14 months |
CONSTRUCTION BUDGET | 24.000.000 € |
DIARCHON’S ROLE
Designs
- Architectural design
- Fire protection design
- Coordination of designs & special designs
- Tender Documents